About us


Nadagoster Asia Company was formed in 2010 with the participation of a group of graduates of Khawaja Nasir and Tarbiat Modares universities with the aim of introducing new methods of measuring and controlling water production and distribution processes in regional water and water and sewage companies, and by presenting an article based on the findings It is based on the studies and experiences gained in water and sewage companies in other countries such as Japan and Australia in the second conference on water and sewage management in Asian countries by Mr. Gholamreza Manouchehri, the chairman of the conference and the honorable deputy minister of energy for urban water and sewage affairs. He was encouraged and received a certificate of appreciation.
Shortly after the conference, the study, design and implementation of the telemetry system of water facilities in Sanandaj including wells, reservoirs, pumping station and water treatment plant in the form of an EPC contract is on the agenda of the Kurdistan Province Water and Sewerage Company. After two years in 2012, the first telemetry system was implemented using modern technologies to measure and control the processes of water production and distribution, and it was inaugurated by Mr. Engineer Gholamreza Manouchehri in the presence of the managing directors of water and sewage companies in neighboring provinces. became
In continuation and at the same time as the specialized and round-the-clock activities of this company in the field of water and sewage companies during the past two decades until November 1400 (the date of compilation of this report), the water facilities of the water and sewage companies are connected to telemetry and SCADA systems as follows. It is equipped with the use of modern technologies for measuring and controlling water production and distribution processes:
Water transmission network facilities related to 23 cities including: wells, reservoirs, pumping stations
Water distribution network facilities related to 2 cities including: pressure gauge, flow gauge, pressure relief valve, minimum chlorine measurement
Dispatching studies and catchment area of 14 dams including: 100 water and meteorological stations
Process facilities 3 sets of water treatment plants
Process facilities 2 sewage treatment plant complex